Veracy

Executive value model · editable assumptions

Turn your data estate into a business case.

Estimate the annual value Veracy can unlock through lower data operating costs, recovered productive capacity and faster time to market.

Parameters

Editable assumptions

01 · FoundationAnnual operating budget allocationReallocate a fixed annual total across four categories100% allocated · total fixed
Share of the fixed annual budget spent on vendors, compute and storage
%
$400K current
Share of the fixed annual budget spent on pipelines, incidents and maintenance
%
$300K current
Share of the fixed annual budget spent on lineage, evidence and metric alignment
%
$180K current
Share of the fixed annual budget spent on tickets, hand-offs and alignment
%
$120K current
Current estate allocated100.0%0.0% remains unassigned
02 · CapacityTranslate budget into capacityConversion only · annual dollars stay fixed$90 / h
Converts the fixed people budget into equivalent person-hours; it does not change dollars.
$
Converts person-hours into FTE equivalents; it does not change dollars or hours.
h
03 · Time-to-marketValue the advantage of arriving earlierOpportunity value, separate from hard savings10 outcomes / yr
Annual decisions or releases supported by the people-work budget above.
/ yr
Illustrative gross-margin or opportunity value for one outcome arriving one week earlier.
$
Annual effort poolPeople-work capacity before → afterHeld constant as outcome volume changes; volume only allocates this pool across modeled outcomes.
6,667 h → 2,400 h / yr

Methodology · transparent by design

A planning model you can challenge.

Every headline traces to a stated assumption: editable client inputs plus disclosed planning constants. Cash spend, productive capacity and timing opportunity remain separate.

01Foundation

Shape the current estate

Allocate today’s fixed annual operating budget across platform, engineering, governance and coordination. Changing the mix does not change the total.

CATEGORY COST = ANNUAL COST × CATEGORY SHARE
02Capacity

Translate cost into effort

Convert the three people-work budgets into equivalent person-hours and FTEs. These inputs change units, not economic value.

ANNUAL PERSON-HOURS = PEOPLE-WORK BUDGET ÷ LOADED COST / HOUR
03Competitive advantage

Value the advantage of moving sooner

Keep the TTM opportunity separate from effort and operating benefit so its commercial assumptions can be challenged or excluded.

TIMING VALUE = OUTCOMES × MODELED WEEKS / OUTCOME × VALUE / OUTCOME-WEEK
04Scenario

Apply the planning case

Use the scenario as a base-mix target, then derive distinct category rates for engineering, governance and coordination.

CATEGORY RATE = SCENARIO TARGET × STAGE FACTOR ÷ BASE-MIX FACTOR

Scenario assumptions

Planning range
ScenarioPlatformPeople target
ConservativeSubstantial legacy retention60.0%41.7%
AverageTypical lakehouse fit69.0%64.0%
Strong fitPredominantly batch and SQL workloads93.8%70.8%

Interpretation guardrails

Read before deciding
  • Recovered capacity is productive value—not an automatic headcount reduction.
  • Person-hours are cumulative effort, not wall-clock cycle time; human judgment and organizational alignment remain essential.
  • Equivalent weeks are summed across modeled outcomes and may overlap in calendar time.
  • Timing value is illustrative until validated against observed cycle times, independent outcomes and outcome economics.
  • Combined opportunity adds operating benefit and TTM only when both are independently realizable and non-overlapping.
  • Migration and parallel-run costs are not included in the modeled result.
  • Category rates use illustrative stage factors of 1× engineering, 2× governance and 4× coordination, with a 0.1 cascade step, normalized to the base mix.

Not included in the estimate

Value not modeled
  • AI-ready business context & hallucination-free execution
  • Human trust in decision support, certified.
  • Internal & external audit readiness